Sustainability strategy

  • 4

    salt flats in the exploration stage in Argentina.

  • 25

    tons per year of lithium carbonate equivalent is the production capacity of Tecpetrol's pilot plant in Salta.

  • USD 45 millions

    is the accumulated investment by TechEnergy Ventures.

Milestones driving Tecpetrol's energy

  • Global

    ∙ 6th Tecpetrol Global Sustainability Report.
    ∙ TechEnergy Ventures invested in 17 companies across six energy transition verticals.

    Argentina

    ∙ Salt flats at exploration stage: El Tolillar, Hombre Muerto, Arizaro, and Guayatayoc.
    ∙ Direct lithium extraction pilot plant in Olacapato, Salta Province, featuring innovative direct extraction technology that is more sustainable when compared to traditional methods.
    ∙ 50% of Tenaris's electricity consumption in Argentina is supplied by the Buena Ventura Wind Farm, a project developed by Tecpetrol.
    ∙ 90% of Ternium's third-party energy supply in Argentina will be replaced by the Vientos Olavarría Wind Farm, a project developed by Tecpetrol.

    Mexico

    ∙ The company has strengthened its position in renewables to provide clean energy to existing plants and new steel projects by Grupo Techint in the region.

    Ecuador

    ∙ Tecpetrol received the Sustainability and Stewardship in the Oil and Gas Industry Award of the Society of Petroleum Engineers (SPE) Ecuador.

Read full chapter