barrels of oil equivalent per day of production.
km of operated gas pipelines.
MMm³/d of gas transportation capacity.
∙ +17 million USD in effective improvements.
∙ Drones, simulators, virtual reality, and artificial intelligence for enhanced safety, efficiency, and sustainability.
∙ Fortín de Piedra reached 1,000 km drilled since its start-up in 2017 and new productive levels were confirmed south of the Neuquén River.
∙ Puesto Parada achieved a technical milestone with the drilling of a 3,582 m horizontal branch and exceeded 1,000 m³ of oil per day in production.
∙ Tecpetrol is moving forward with the development of Los Toldos II Este, an unconventional oil project in Vaca Muerta.
∙ The Agua Salada and Ramos concessions were extended for 10 years.
∙ Arenas Diamante achieved a production record of 21,613 tons and incorporated its own last-mile logistics system to transport sand from the warehouse to the well.
∙ Drilling rigs in operation and managed from the Real Time Operation Center in Buenos Aires.
∙ At the Maute field, the first phase of seismic exploration was carried out and progress was made on formalizing prior consultation with communities.
∙ An additional 8.5 million barrels of oil were achieved through the implementation of secondary recovery at the Libertador field.
∙ Libertador and Shushufindi committed new investments and extended the terms of their contracts for five years.
∙ Operations were resumed at the Misión Block following the partial suspension due to property security concerns.
∙ Training in immersive virtual reality scenarios to preserve asset integrity and ensure service continuity.