wells in production.
barrels of oil equivalent per day of production.
km of operated gas pipelines.
MMm3/d of gas transportation capacity.
∙ 1 TCF (trillion cubic feet) of accumulated gas production in Fortín de Piedra, equivalent to Argentina's residential consumption for three years.
∙ The Ramos field in Salta is now operated by Tecpetrol.
∙ Launch of the unconventional oil development project in Puesto Parada.
∙ 15 years of Tecpetrol Colombia.
∙ Drilling of the longest horizontal branch of a geonavigated well in the country.
∙ 25 years of leadership, operations, and challenges in terms of environmental sustainability and energy availability.
∙ The Pesquería Power Plant supplied electrical energy to Ternium and Tenaris plants in Mexico with an operational availability exceeding 99%.
∙ The CEP has an installed capacity of 900 MW, equivalent to the consumption of 1.3 million households.
∙ 20 years since Tecpetrol began operating in the gas and liquids transportation system of the Camisea field.