reduction in the GHG emission intensity from E&P operations compared to 2023.
reduction in total waste generation compared to 2024.
reduction in the number of spills greater than one barrel compared to 2024.
increase in total recycled waste volume compared to 2024.
∙ The GHG calculation tool was optimized and the emission sources of the operations were updated with the support of external consultants, enabling a more precise and reliable quantification of GHG emissions and energy consumption.
∙ Approximately 14 tons of waste were recovered due to the participation of 415 individuals through the “Clean Up the World” campaign.
∙ Advancements were achieved in in situ waste management, including waste valorization processes in the Neuquén Basin, as well as the integration of classification and source separation at Libertador field (Ecuador) and the Pesquería Power Plant (Mexico).
∙ Over 80,000 individuals of native species were planted across more than 51 hectares.
∙ At the Pesquería Power Plant and Misión, over 4,500 individuals of native species were planted.