Mexico

Exploration and Production

Misión Block
In Mexico, Tecpetrol provides Pemex with comprehensive services at the Misión block in the Burgos basin and has been achieving a steady increase in production output and reserves.

System 3
The company provides services to guarantee the integrity and reliability of a 400 km-long pipeline system including 13 rights of way and 10 measurement points running through the states of Tabasco, Chiapas and Campeche.

Pesquer韆 Power Plant
The combined cycle power generation plant has three gas turbines and one steam generator, and supplies energy to the TenarisTamsa and Ternium industrial plants in Mexico. It has a generation capacity of 900 MW, making it one of the ten largest in the country.

Pesquería Power Plant
ECO FRIENDLY DESIGN
The plant runs on zero liquid discharge equipment, uses treated gray water for services and conducts a permanent environmental monitoring program.

Net generation capacity (MW): 900
Investment (millions of dollars): 1,000
Employees (full-time): 90
Jobs (during construction): 1,200