Bolivia

Chaco basin:
Tecpetrol is involved as a non-operator with a 20% stake in the Ipati and Aquío exploration blocks where production began in 2016. Four deep wells were drilled and a plant with a 280 MMscf/d gas treatment capacity was built, equivalent to the current output from the fields.

IPATI AND AQUIO BLOCKS
Gas field development:
Together with Total (60%) and Gazprom (20%), the company is heading up the project to develop the Incahuasi and Aquío fields, which includes a gas treatment plant.

280 MMscf/d PRODUCTION CAPACITY
2 BILLION DOLLAR INVESTMENT IN THE ENTIRE PROJECT
100 km OF CONNECTING PIPELINES
4 WELLS DRILLED
1 TREATMENT PLANT